Serious work began on the road to HQ2, this is all in preparation for the final loads of finished gravel/stone dust. The cement pad in the middle of the roadway is a ‘spillway’ for the large volume of water that flows out of the field on a heavy rain.
 - Digging out the spillway 
 - Dug down further than I realized they would 
 - Spill way form, 2″ drop from left to right 
 - Rebar and mesh reinforced 
 - Had the cement truck, might as well add sidewalks too! 
 - Getting the cement to the house required the scoop on the skid-steer and numerous trips 
 
 
 - Thats alot of cement 
 - Handprints? 
 - Sidewalk is a nice touch 
 - First ‘crusher run’ of gravel 