Serious work began on the road to HQ2, this is all in preparation for the final loads of finished gravel/stone dust. The cement pad in the middle of the roadway is a ‘spillway’ for the large volume of water that flows out of the field on a heavy rain.
Digging out the spillway Dug down further than I realized they would Spill way form, 2″ drop from left to right Rebar and mesh reinforced Had the cement truck, might as well add sidewalks too! Getting the cement to the house required the scoop on the skid-steer and numerous trips Thats alot of cement Handprints? Sidewalk is a nice touch First ‘crusher run’ of gravel