Dam repairs Posted on March 12, 2013 by admin First step, temporarily lower water level by installing 12″ pipe through dam. Hopefully will be able to remove sediment from the other end. Later on we’ll put the pipe lower and install an elbow, vertical riser and a ‘trash guard’.