Dam repairs

First step, temporarily lower water level by installing 12″ pipe through dam. Hopefully will be able to remove sediment from the other end.  Later on we’ll put the pipe lower and install an elbow, vertical riser and a ‘trash guard’.

20130312-152133.jpg

20130312-152151.jpg

Leave a Reply

Your email address will not be published. Required fields are marked *